Status of ORR Land Acquisition »
The Land required for the ORR is proposed to be taken up in two Phases. Phase I is the 22 Km Stretch between Gachibouli Junction and the Shamshabad NH7 Junction at Tondupally. The total land required is 750-00 Ac., out of which the private land is 500 Ac. And the remaining stretch is the Phase II, which covers the remaining 137 Km. The land required for Phase II is about 5500 Ac., out of which the Govt. land is about 1000 Ac. 7 SDCs are inducted in the Project for the entire Land Acquisition. The Status of Land Acquisition for ORR is given below. |
| |
Phase I
The total Private land required for Phase I is 500 Ac. It is being acquired by four SDCs. The Estimated Cost of Acquisition is Rs. 32.55 Cr. out of which the Cost of Land is Rs. 26.55 Cr. and the cost of Structures is Rs. 6.00 Cr. Except at Junctions, the land acquisition is completed for PhaseI.
The Junction Areas are demarcated and Surveyed. The areas include Shamshabad Jn.(already notified under Urgency clause), Gachibouli In., Nanakramguda In., & APPA Jn.
Phase II
The total Private land required for Phase II is 4500 Ac. The Estimated Cost ofAcquisition is Rs. 250 Cr. Entire Extent is at Draft Notification Stage. The Phase II Consultants, the Aarvi Associates, the Engineering and the Revenue Units are jointly surveying the Phase II Alignment. By 15th January, 2006, the Central line of the Alignment will be fixed. By 15th Feb, 2006, the ROW Pillars will be erected. By 15th April,2006, the Land acquisition will be completed. |
| |
| |
Land Compensation:
The Land is being acquired for the ORR by passing General Award. The normal provisions of the LA Act are being observed for determining Compensation amounts. For the Losers of Houses the Rehabilitation measures are being worked out based on the Resettlement & Rehabilitation Policy of the Govt. of AP. |
|
| |
| |
|